When full ram seals well, inject weighted mud into well bore to perform well killing.
When well blowout occurred, inject water into well through kill manifold to prevent be on fire.
When the well is on fire, inject extinguishing agent into well bore through kill manifold to put out fire.
Material
Working Pressure
2000PSI~20000PSI
Nominal Bore
2.1/16"~4.1/16"(46mm~103mm)
Working Medium
Drilling Fluid ,Mud
Working Temperature
-46°C~121°C(Class LU)
Oilway is Indonesia's leading valve manufacturers and suppliers with clients all over the globe. We ensure that we meet all your industrial valve requirements with utmost precision.
CONTACT US
NO.98 New century Road, Jianyang Petroleum equipment industry Zone, JianhuCountry, Jiangsu province,China.